Landscaping & aggregates

Gravel Driveway Calculator

Turn your driveway dimensions into a clear material estimate. Calculate volume, weight and a budget using your supplier’s density and price.

Project details

ft
ft
in
Depth of the single layer you are estimating.
ton/yd³
Starting density is illustrative. Use your supplier’s value in the displayed units.
%
Extra ordered material; not a compaction model.
Your cost estimate
$/ton
Example price. Enter a current supplier quote.
$
%
Make it your estimate. Starting prices and dimensions are examples. Enter your quote and project specification. All budgets are in USD.

How the calculation works

Measure a rectangular area and enter the depth of one material layer. Split an irregular driveway into rectangles and calculate each area separately. The tool does not infer a driveway design or a suitable layer thickness.

The calculator first finds volume, adds your material allowance, then multiplies by bulk density. Particle size, grading, moisture and compaction change how much a cubic yard weighs. A supplier’s bulk density is more useful than a generic rock density.

In US mode, a ton means a US short ton of 2,000 lb. Metric mode uses a tonne of 1,000 kg. Switching units also converts density and the price basis, so the estimate remains equivalent.

Volume (yd³) = length (ft) × width (ft) × depth (in) ÷ 324
Order volume = volume × (1 + allowance ÷ 100)
Weight (US short tons) = order volume × density (ton/yd³)
Cost = material + delivery + entered tax

A worked example

For a 40 ft × 12 ft driveway with a 4 in layer, the geometric volume is 5.93 yd³. With a 10% allowance, the order volume becomes 6.52 yd³. At an illustrative 1.4 US short tons/yd³, that is 9.13 US short tons. An example price of $55 per short ton gives $501.93 before delivery and tax.

Common questions

Is a US short ton the same as a metric tonne?

No. A US short ton is 2,000 lb (907.18474 kg); a metric tonne is 1,000 kg. The unit switch converts both the density and price basis.

What density should I enter?

Use a bulk density from the supplier for the material and moisture condition being ordered. The initial 1.4 US short tons per cubic yard is an editable illustration, not a universal material property.

Does the allowance account for compaction?

It adds an explicit percentage to the order quantity. It does not model compaction. Ask your supplier how the delivered loose material relates to the finished layer before selecting the allowance.

Can I include more than one layer?

Calculate each layer separately with its own depth and density, then add the material costs. The first release intentionally keeps each estimate to one layer.